What types of documentation must be sealed by a Professional Engineer?
For projects with a construction value greater than $12,500, the following documentation, as a minimum, must be signed and stamped by a Professional Engineer:
- Design Drawings - Each Individual Design Drawing Sheet.
- Engineering Calculations and Design Data - As required by the Water and Wastewater Treatment Program or by the Arizona State Board of Technical Registration’s rules and regulations.
- Engineering Design Report - Cover, Table of Contents or First Page.
- Engineer’s Certificate Of Completion - As required on the certificate form.
- Operations and Maintenance Manual - Cover, Table of Contents or First Page.
- Reports and Other Documentation - As required by the Water and Wastewater Treatment Program or by the Arizona State Board of Technical Registration’s rules and regulations.
- Technical Specifications - Cover, Table of Contents or First Page.

If the project is a reuse water system, then the documentation may be stamped by a Professional Landscape Architect instead of a Professional Engineer. The Professional Engineer or Landscape Architect must be registered in the State of Arizona. The engineering or architectural firm must be registered with the Arizona State Board of Technical Registration.

If there are any questions about the rules and regulations related to sealing documentation, it is recommended that engineers or architects submitting documentation to the Water and Wastewater Treatment Program contact the Arizona State Board of Technical Registration.

Show All Answers

1. What types of documentation are required to be submitted?
2. Are electronic (digital format) documentation submittals accepted?
3. Does the documentation submitted for my project become part of the 'public record'?
4. My project contains proprietary or sensitive information. How can I protect this data?
5. What types of documentation must be sealed by a Professional Engineer?
6. What format and how many copies of the documentation should be submitted?
7. What is the submission sequence for project documentation?
8. What are the criteria used for the review of submittals?
9. Does the MCESD sign the cover page of the design drawings?